Planning Around China's CNY Shutdown for Moissanite Orders

Planning Around China's CNY Shutdown for Moissanite Orders

If you have ever tried to place a moissanite order in mid-January and heard that the factory is already booked through the holiday, you already know how brutally the Chinese New Year (CNY) schedule punishes late planning. Across Wuzhou's moissanite workshops, Shenzhen's jewelry factories, and the logistics hubs that connect them, the entire supply chain slows to a near-stop for two to three weeks. Retailers who ignore this calendar walk into February with empty shelves and angry customers.

When the shutdown actually happens

CNY dates shift each year because they follow the lunar calendar, but the pattern is consistent. Factories typically stop accepting new production about three to four weeks before the holiday, shut down entirely for seven to fourteen days around the holiday itself, and take another week or two to fully ramp back up afterward. During ramp-up, workers return gradually, utilities restart, and quality is uneven for the first week. Plan for roughly a six-to-eight-week window between your last normal production order and the time a new order ships reliably.

The single most useful habit is to ask your supplier for this year's exact shutdown dates in November, not January. Small workshops book up quickly, and once the cutting and polishing benches are full, no amount of urgency moves the queue.

Order timing by season

For most Western retailers, the post-CNY months of February and March include Valentine's Day sales tail-off, spring bridal shows, and Mother's Day planning. If your suppliers are offline, you need that stock already on your shelves. A practical calendar looks like this: place your pre-holiday stock order by mid-November or early December, allowing six to eight weeks for production, QC, and ocean freight. If you rely on air freight, you can compress this, but air capacity tightens in the weeks before CNY as everyone rushes to ship.

For Mother's Day, which falls in May, you can afford to order during the first weeks of March once factories reopen. For Valentine's Day, the stock must be in the country before December ends; anything ordered after Thanksgiving is already at risk.

Logistics backlog after the holiday

When factories reopen, every buyer in the world is trying to push the orders they could not place in January through the same doors simultaneously. Ports, customs, and courier networks all back up. Lead times that normally run four to six weeks can stretch to eight or ten. Build this into your Q1 forecasting: assume slower replenishment through March, and order more generously in November rather than relying on a quick reorder in February.

Communicate with your supplier

Established suppliers will publish a shutdown calendar and a cutoff date for last orders. Ask for it in writing. If you have a custom order with tooling or CAD work, get the design approved and the deposit paid before the holiday, so production can start the day the factory reopens rather than waiting on a back-and-forth that eats another week. Confirm who handles emergencies during the shutdown, even if the answer is "nobody, until February."

Plan your cash flow around the shutdown

The CNY window also changes how suppliers want to be paid. Factories prefer to settle outstanding balances before the holiday, because workers leave for weeks and no one is around to chase invoices. Expect to be asked to clear open statements in December. On the upside, some suppliers offer slightly better pricing or priority production for orders confirmed well in advance, because their own planners want a full queue before the break. If you can forecast six months out, the pre-CNY ordering window is often one of the most efficient times to buy.

What this means for your own customers

Internally, plan your marketing around the calendar. If you will be low on stock in February, do not run a promotion that drives demand you cannot fulfill. If you are well-stocked from a November order, February becomes a quiet opportunity to sell without the usual rush of new inventory arriving. Retailers who treat the CNY shutdown as a known constraint rather than a surprise end up with Q1s that look planned instead of panicked.

Add the shutdown dates to your internal planning calendar as soon as your supplier publishes them, and set a reminder three months out to begin the pre-holiday order conversation. Over a few years, this becomes a habit rather than a project, and the February stockouts that catch less prepared retailers off guard simply stop happening to you.

It is also worth remembering that the shutdown is not a Chinese phenomenon in isolation. Port workers, customs brokers, and freight forwarders across the region follow similar holiday rhythms, so a container that would normally clear in a few days can sit longer. Build that buffer into your promised delivery dates for any February or early-March promotion, and over-communicate with customers if a date slips. Most buyers understand the season; none of them understand silence. For the rest of the year, our shipping and logistics guide for wholesale jewelry covers the ordinary freight decisions the CNY calendar does not.

For HS classification of jewellery in customs and export documentation, the WCO Harmonized System nomenclature is the authoritative nomenclature.

Authoritative References

For buyers who need to verify the technical and regulatory basis of this guide, the following independent institutions publish authoritative reference data:

Frequently Asked Questions

Is moissanite a good diamond alternative for retail buyers?

Yes for price-sensitive customers who want brilliance and hardness. Moissanite ranks 9.25 on the Mohs scale, holds up to daily wear and costs a fraction of a natural diamond of the same size, so it resells fast in bridal and fashion lines.

What is the minimum order for wholesale moissanite?

MOQ starts at 50 pieces per design for stock items. Custom cuts and private-label settings usually start at 100–300 pieces depending on the mold.

Do you provide certificates with moissanite stones?

Yes. Every parcel ships with GRA or IGI documentation listing carat weight, color grade and cut. We recommend passing the certificate to your end customer for trust.

How long does sample and bulk production take?

Samples ship in 3–5 days. Bulk runs take 15–20 days under 500 pieces, and 25–30 days for custom work.

Need a quote for your next order?

Get Wholesale Pricing

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .