When a boutique buyer compares two suppliers, lead time is usually the first filter. Supplier A quotes 15 days, supplier B quotes 25 days, and A wins on the spreadsheet. Three months later, A is shipping in 35 days, B is shipping in 26, and the buyer is out of a bestseller SKU for two weeks. The spreadsheet was wrong because it compared a single number to a single number, when lead time is actually six numbers stacked on top of each other.
The six components of lead time
- Stone sourcing (FTC jewelry industry guides). Does the factory already have the moissanite size and cut in stock, or do they pull it from a stone trader?
- Production slot. How long between PO acceptance and the bench actually starting the piece?
- Manufacturing time. Casting, setting, finishing, plating, polishing.
- In-house QC. The 15 to 30 percent buffer factories add for inspection, re-polish, re-setting of loose stones.
- Transit. International express freight, typically 5 to 7 days door to door, longer for sea freight.
- Customs clearance. A variable that adds anywhere from one day to two weeks depending on the route and your import profile.
A supplier who quotes "15 days" usually means production only. A supplier who quotes "25 days" often means door-to-door. They are not the same number, and the second is the one you can actually plan against.
The six questions to ask in writing
Ask these of every supplier you are considering, in an email, so the answer is on record:
- "Is this SKU in stock now, or made-to-order?" Stock and made-to-order are two completely different clocks.
- "What is the production lead time from PO confirmation to parcel ready to ship?"
- "What courier do you use for [your country], and what is the typical door-to-door transit time?"
- "Do you ship DDP or DAP, and who handles customs clearance?"
- "What is the realistic worst-case total door-to-door for a repeat reorder of this SKU?"
- "What is your current backlog? Are you at capacity, under capacity, or somewhere in between?"
The last question is the underrated one. A supplier at 90 percent capacity will quote you the same 25 days but actually deliver in 40. A supplier at 60 percent capacity will hit 25 days every time. You cannot tell capacity from a catalog; you have to ask.
How to test lead time without risking the store
The cheapest way to verify a supplier's lead time is a small test order. Two or three SKUs, in the minimum quantity, tracked from PO to delivery. Compare the actual door-to-door to the quoted door-to-door. The delta is your planning buffer. If they quoted 25 and delivered in 28, your buffer is three days. If they quoted 25 and delivered in 38, your buffer is two weeks, and you either re-negotiate or add that buffer to every future reorder calculation.
Planning around the answer
Once you have a real door-to-door number, your reorder point is simple. If you sell through a bestseller in 30 days, and door-to-door is 35 days, you reorder when you have 35 days of stock left, not when you run low. Buyers who order "when I need it" are always late, because the lead time is longer than the runway they thought. Buyers who order against a tested lead time rarely stock out.
Seasonal distortion
Lead times are not constant. Pre-holiday and pre-engagement-season windows stretch every supplier, because every buyer in the category is ordering at the same time. A supplier who ships in 25 days in July may ship in 45 days in October. Ask what the lead time looks like in your peak months, not what it looks like today. Calendar your holiday reorders eight to ten weeks ahead of the selling season, not four.
What to do when a supplier misses
Misses happen. The question is how the supplier handles them. A supplier who notifies you proactively, offers a partial shipment, and absorbs the expedited freight on the late portion is a supplier you keep. A supplier who goes silent for ten days and then ships a partial parcel without explanation is a supplier you replace. Track these behaviors on a simple scorecard after each order; the pattern over three orders is more informative than any single quote.
For an apples-to-apples comparison across our own catalog, see the ring collection, where in-stock and made-to-order SKUs are flagged separately. Build a simple one-page scorecard once you have tested two or three suppliers: rows for each supplier, columns for quoted lead time, actual lead time, fill rate on partial shipments, and how they handled the last miss. Six months of data on that scorecard is worth more than any sales call.
Do not confuse price with lead time
A supplier who quotes a lower unit price but stretches lead time by two weeks is not cheaper. The two weeks you wait is two weeks you are out of stock on a SKU that would otherwise be selling. When you compare total cost of ownership, add the cost of the missing sales to the unit price. A supplier with a slightly higher unit price but a tested, on-time lead time is usually the better buy once the stockout cost is counted. This is the mistake new buyers make most often: they optimize the invoice and ignore the shelf.
For HS classification of jewellery in customs and export documentation, the WCO Harmonized System nomenclature is the authoritative nomenclature.
Frequently Asked Questions
Is moissanite a good diamond alternative for retail buyers?
Yes for price-sensitive customers who want brilliance and hardness. Moissanite ranks 9.25 on the Mohs scale, holds up to daily wear and costs a fraction of a natural diamond of the same size, so it resells fast in bridal and fashion lines.
What is the minimum order for wholesale moissanite?
MOQ starts at 50 pieces per design for stock items. Custom cuts and private-label settings usually start at 100–300 pieces depending on the mold.
Do you provide certificates with moissanite stones?
Yes. Every parcel ships with GRA or IGI documentation listing carat weight, color grade and cut. We recommend passing the certificate to your end customer for trust.
How long does sample and bulk production take?
Samples ship in 3–5 days. Bulk runs take 15–20 days under 500 pieces, and 25–30 days for custom work.



