Supplier Relations · August 6, 2026 · 28 views

Moissanite Supplier Contract Terms: Protect Your Buy

Moissanite Supplier Contract Terms: Protect Your Buy

A boutique in Miami paid a 30% deposit on a custom moissanite line. When the parcel arrived with stones that did not match the approved sample, the supplier pointed to an email that said "final quality at factory discretion." The buyer had no paper agreement to push back on. The deposit was partly gone. Wholesale contracts are not for lawyers; they are the difference between a dispute you can win and one you cannot.

Problem breakdown: what verbal terms leave open

Wholesale disputes almost always land in the same five places: who owns the design, what counts as a defect, when the RMA window closes, whether the price holds on reorder, and what happens if a shipment is late. None of these should be settled by email thread.

ClauseVerbal / email positionWritten position to ask for
Quality standard"Premium quality"Reference spec sheet, GRA grade, 1.5kg prong pull
RMA window"Let us know if there's an issue"30 days from delivery, photo evidence, defect definition
Pricing on reorder"Same price roughly"Price held 90 days on same SKU and lot
IP and toolingSilentYou own the design; supplier holds mold 12 months
Late deliverySilentPartial refund or air-freight credit beyond agreed date

The clauses worth putting in writing

You do not need a 30-page legal document (FTC jewelry industry guides). You need a one-page order acknowledgment that pins these points.

  • Quality reference. Attach the spec sheet to the PO: stone shape, mm, GRA color and clarity, metal, plate thickness (0.5um rhodium), and the 1.5kg prong pull standard. "Premium" is not a standard. Numbers are.
  • Defect definition and RMA window. Define what counts as a defect: loose stone, cloudy stone, wrong size, plate through to base metal. Set the window at 30 days from delivery, with photo evidence. Stones that fail within 12 months from setting failure go under remake or credit, not the customer.
  • Pricing hold. The same SKU, reordering within 90 days, holds the original price. Metal price swings happen; the clause says who absorbs them within a band.
  • IP and tooling. Your custom design is your IP. The supplier holds the mold under your account for 12 months so reorders restart from the approved sample. The tooling fee is credited back at the agreed reorder volume.
  • Delivery and freight. Agree an ex-factory or DDP date, the shipping line, and what happens if the date slips: an air-freight credit or a percentage refund. We ship DDP to EU and US addresses with full customs documentation, and the incoterm is written on the PO.

One clause buyers forget until it matters: what happens when a defect is disputed after the 30-day window. A short after-sales line covers setting failures that surface within 12 months, because a prong that loosens at month four is not a customer-caused problem and should not be argued about. Write the line as a number, not a promise: stones loosened within 12 months due to setting failure are remade or credited, and the lot number on the certificate feeds the root-cause review. With that on paper, the RMA desk becomes a routine exchange instead of a negotiation.

What to expect by supplier tier

First-order buyers (under 200 pcs)

You do not need a full master agreement yet. Ask for a written order acknowledgment with the spec sheet attached and the RMA window stated. That covers 90% of what can go wrong on a first buy.

Growing boutiques (repeating orders)

Move to a one-year supply agreement that locks pricing holds, tooling ownership and the defect standard. We have exported to EU and US retailers for over a decade, so the paperwork is standard and we are used to signing it.

Private-label programs (multi-SKU, annual volume)

Negotiate an annual agreement with a safety-stock bin, a dedicated account contact, and a quarterly quality review against the defect log. ISO-documented QC records feed that review so the terms stay tied to measured outcomes.

Frequently Asked Questions

What should a wholesale moissanite contract actually say?

It should pin the quality spec (GRA grade, plate thickness, prong pull), the 30-day RMA window, the 90-day reorder price hold, tooling ownership and the delivery date with a late-delivery remedy.

How long should the RMA window be?

Thirty days from delivery is standard for incoming defects. Setting failures that show up within 12 months should be covered under remake or credit as a separate after-sales clause.

Do I own the tooling for my custom design?

Yes. In a written agreement, your custom design and mold are held under your account. We hold the mold for 12 months so reorders restart from the approved sample.

What happens if a shipment is late?

A written clause sets a delivery date and a remedy, usually an air-freight credit or a partial refund. We ship DDP to EU and US addresses and state the incoterm on every PO.

Takeaways

  • Attach the spec sheet to every PO; "premium" is not a standard.
  • Put the RMA window, defect definition and price hold in writing.
  • Confirm tooling and design ownership before paying a tooling fee.
  • Request our standard order acknowledgment template; it is ready to send.

Read our shipping and RMA terms, see the OEM agreement flow, or review the quality spec sheet.

For HS classification of jewellery in customs and export documentation, the WCO Harmonized System nomenclature is the authoritative nomenclature.

Need a quote for your next order?

Get Wholesale Pricing

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .