China produces 70% of the world's jewelry. Learn to source quality 18K gold from reputable manufacturers.
Sourcing Steps
| Step | Action | Timeline |
|---|---|---|
| 1 | Research and shortlist factories | 1-2 weeks |
| 2 | Request samples and certifications | 2-4 weeks |
| 3 | Verify factory (visit or video) | 1 week |
| 4 | Place trial order (50 pcs) | 3-6 weeks |
| 5 | Quality inspection | 1 week |
| 6 | Scale up regular orders | Ongoing |
Quality Verification
Check hallmarks (18K/750). Verify gold content with XRF tester. Inspect casting for porosity. Check stone settings. Holycome provides XRF reports and 100% QC.
Red Flags
Prices significantly below market. No factory visit allowed. Unwilling to provide certifications. No quality inspection process. Holycome passes all verification checks.
Karat, Plating and Labelling Discipline
Solid 10K, 14K and 18K carry different price points and different legal labelling requirements. Label by construction, not by appearance: solid, gold-filled, vermeil or plated. Mislabeling plated goods as vermeil is the most common compliance complaint in this category.
Gold-filled is a bonded layer of karat gold over brass and holds up far better than plating at a fraction of solid-gold cost. Vermeil requires a minimum thickness over sterling, so ask for the micron specification in writing.
Stamp karat and maker marks on every solid and vermeil piece. It supports customs declarations and gives your retail customer a verifiable claim, which is worth more than the stamping cost.
Sourcing Benchmarks for This Category
Buyers usually benchmark three numbers before they shortlist a supplier: unit cost at a fixed volume, sample lead time, and the reject rate they can absorb without hurting sell-through. Get all three in writing, because a low unit price with a 12% reject rate is more expensive than a mid price with a 3% reject rate.
For stock designs HOLYCOME quotes from 50 pieces per design. Samples leave Wuzhou in 3 to 5 days. Bulk production runs 15 to 20 days under 500 pieces, and custom molds run 25 to 30 days. Payment is 30% T/T deposit with the balance against the bill of lading, and sample costs are credited back on the bulk order.
Ask for the cost breakdown line by line: metal weight, stone cost, labor, plating and packaging. Suppliers who will not break out metal weight are usually padding the labor line, and you cannot negotiate what you cannot see.
How the Production Line Actually Runs
The process starts with CAD. Your sketch, reference photo or existing sample is modelled to scale, and a 3D render comes back for approval. Nothing is cast until you sign off, which is where most quality problems are avoided.
From the approved model the factory cuts a wax or resin pattern, casts the piece, then sets stones by hand. Setting is the step that decides whether a ring looks like a $40 piece or a $400 piece: prongs must be even, seats must be flush and no stone should sit proud of the surface.
After setting, pieces go through polishing, plating and a final inspection under 10x magnification. Rejects are pulled at that station, not at packing, so a clean carton is a sign the QC step is real rather than a formality.
Quality Control You Should Specify
Write your acceptance criteria into the purchase order instead of relying on a verbal promise. The usual baseline is 3 to 5% dimensional or setting defects under 10x loupe, with defective units replaced free in the next shipment.
For plated goods, specify plating thickness and ask for a salt-spray result. One to two micron PVD over 316L holds colour for 12 to 18 months of daily wear; thin flash plating fails within weeks and comes back as refund requests.
For stone-set goods, add a stone-retention check: press each stone lightly and reject any that moves. A single lost stone costs more in goodwill than the whole piece costs to make.
Packing, Shipping and Paperwork
Packing protects margin. Each piece goes into an anti-tarnish bag with a sulfur absorber, then a labelled inner box, then a master carton with a packing list that matches your SKU codes. Mixed size and colour runs are packed and labelled separately so your receiving team does not have to re-sort.
Shipments leave through Guangzhou or Shenzhen. DDP is convenient for a first order because the landed cost is fixed; DAP is cheaper once you have your own customs broker. Either way, confirm the HS code and origin declaration before the carton seals.
Keep the commercial invoice, packing list and any certificate of origin in one folder per shipment. If your marketplace or a customs broker asks for documentation six months later, that folder is the difference between a routine answer and a delayed shipment.
Frequently Asked Questions
Is it safe to source gold from China?
Yes — from reputable manufacturers. Always verify hallmarks and request XRF testing.
How do I handle customs/duties?
Holycome ships DDP (delivered duty paid) for most countries. Ask about shipping options.
Conclusion
Holycome is a verified Wuzhou jewelry manufacturer. Contact service@holycome.com for sourcing guidance.
Related Articles
- Quality Control Checklist for Receiving Wholesale Jewelry Orders
- Gold Bracelet Buying Guide - HOLYCOME
For HS classification of jewellery in customs and export documentation, the WCO Harmonized System nomenclature is the authoritative nomenclature.
Authoritative References
For buyers who need to verify the technical and regulatory basis of this guide, the following independent institutions publish authoritative reference data:
- Wikipedia: Sterling Silver - the 92.5% silver alloy standard and hallmarking conventions.
- ISO 9001 Quality Management - the international standard for consistent production quality.
Related reading: Wholesale MOQ Explained: Small Batch Jewelry Sourcing from China, 18K Gold Jewelry Quality Guide for Wholesale Buyers, Shipping & Logistics Guide for Wholesale Jewelry Orders from China.
