A US bridal brand sent a CAD file to a low-cost factory and asked for ten sample rings. The factory cast straight from the file, skipped the wax approval, and returned samples where the ring head sat 1.2 millimeters off the planned finger position. The brand lost six weeks waiting for a redo and went into a trade show understocked. This is the OEM workflow we run, with the approval gates that stop that error from ever reaching production.
Where OEM orders actually go wrong
Most OEM failures are not casting failures. They are approval failures. A CAD file looks perfect on a screen, but lost-wax casting shrinks the wax by roughly 12–15%, and that shrinkage moves prongs, head height and shoulder width. A factory that skips the wax sample is betting on math instead of measuring wax.
| Stage | Skip it, and you get | We require |
|---|---|---|
| CAD review | Unworkable prong geometry | Senior setter signs off on file |
| Wax sample | Shrink distortion, head misalignment | Photo plus physical wax to you |
| First casting | Porosity in thin shanks | X-ray spot check, 10% of run |
| Stone setting | Loose stones after 60 days | 1.5 kg prong pull test, every unit |
| Plating and polish | Bright rhodium, dull inside shank | 5-stage polish, ultrasonic finish |
The brand's 1.2mm error was a skipped wax step. Once you approve the physical wax, the casting math is locked and the final piece lands within 0.1mm of the approved sample.
The OEM process we walk every brand through
- CAD intake: you send STEP or IGES files, or a hand sketch and reference photos. Our modeler returns a 3D render with dimensions within two business days.
- Wax approval: a 3D-printed wax is cast and shipped to you, or photographed against a ruler. You sign off on head height, prong count and shoulder shape before any metal is poured.
- First casting in sterling or 10k/14k: we cast one pilot piece, polish, set a moissanite sample stone, and photo it on a hand for proportion check.
- Production run: only after the pilot is approved do we run the full batch. Every unit goes through the same 1.5 kg prong pull and plating gauge check.
- Final QC and pack: GRA card matched to stone, retail packaging, export documents bundled for DDP shipping.
Moissanite at Mohs 9.25 is forgiving during setting — it does not chip like ruby or emerald — but the prongs that hold it are not. That is why every unit gets the pull test rather than a sampling.
Which OEM entry point fits your brand
Startup with one hero design
Run a 30-piece pilot. You pay for the CAD and wax once, and the 30 pieces fund a real sell-through test before you commit to 300. Most brands in this tier start with 925 sterling and move to 14k on the second reorder.
Established brand refreshing a collection
Bundle four to six designs into one production run so the casting batch shares setup time. Ask for a shared mold plate if several designs share a shank width — that cuts per-design cost by about 15%.
Brand launching a flagship line
Plan for solid 14k gold, custom hand-engraved details, and a private packaging run. This tier usually runs 4–6 weeks including sample approval, and we assign a production contact who sees the order through start to finish.
Frequently Asked Questions
What is the MOQ for OEM production?
The pilot run starts at 30 pieces per design in 925 sterling. Full production runs at 100 pieces per design, with shared shank molds allowed across designs at the buyer's request.
Can you work from my own CAD file?
Yes. Send STEP or IGES files and we return a dimensioned 3D render within two business days. If your file has setting geometry that will fail, we flag it before casting, not after.
Do you ship physical wax samples?
We ship physical wax samples on request for a small courier charge, or provide high-resolution photos against a ruler for buyers who prefer to approve digitally. You sign off before metal is poured.
What metals do you cast in?
We cast in 925 sterling silver, 10k and 14k yellow, white and rose gold, and platinum 950 on request. Gold is sourced from recycled stock with assay paperwork shipped with the order.
How long does a full OEM run take?
Stock-adapted designs run 2–3 weeks from CAD approval. Fully exclusive CAD designs run 3–4 weeks including wax and pilot approval, plus 5 business days for DDP shipping.
Takeaways
- Skip the wax approval and you are betting 100 units on a screen render. Insist on a physical or photographic sign-off.
- Batch four to six designs into one run to share casting setup and cut per-design cost.
- Start in sterling, move to gold on reorder once the design proves out.
- Lock prong pull testing to every unit, not a sample, because that is where 90-day failures originate.
Next step: send your CAD or sketch for a free CAD review, pilot run from 30 pieces, wax approval before casting.
See OEM process, view reference designs, read manufacturing guides, or book a factory call.
For HS classification of jewellery in customs and export documentation, the WCO Harmonized System nomenclature is the authoritative nomenclature.
Authoritative References
For buyers who need to verify the technical and regulatory basis of this guide, the following independent institutions publish authoritative reference data:
- GIA Gem Encyclopedia - independent grading and identification reference for natural and lab-grown gems.
- Wikipedia: Moissanite - peer-reviewed background on moissanite chemistry, optics and history.

